Audit Hub
Note: Audit Hub is currently a Beta feature.
- Measure how complete your metadata is against a standard such as the Basel Committee on Banking Supervision standard 239 (BCBS 239).
- Find the assets that fail a specific check, ranked by how many downstream consumers depend on them.
- Compare domains, teams, and data products on the same scale.
- Track progress toward an organization-wide completeness target.
- Maintain several standards at the same time, each with its own rules, scores, and history.
How Audit Hub Works
Audit Hub scoring is deterministic. Each check is a counted condition on the asset’s metadata, so the same metadata always produces the same score.- Collect facts: Scoring runs as part of the Data Insights application. Data Insights captures the metadata facts of each asset, such as description length, owner, linked glossary terms, and contract status.
- Evaluate checks: Each enabled standard evaluates its checks against the captured facts. An asset passes or fails each check.
- Weight and roll up: Check weights roll up into dimension scores. Dimension weights roll the dimension scores up into an asset score, and asset scores roll up into team, domain, data product, and organization scores.
- Pin the run: Each run stores its result together with the rule version it used. A past score stays reproducible even after the standard changes.
Dimensions
A standard groups its checks into five dimensions.
Each dimension has a weight, and the weights of all dimensions in a standard total 100%.
Asset Types in Scope
A standard grades the asset types selected in its scope. The built-in BCBS 239 standard grades tables, dashboards, pipelines, topics, ML models, data products, API endpoints, containers, search indexes, dashboard data models, and stored procedures. Change the selection on the Standards & Rules tab. Deleted assets are excluded.Prerequisites
Before you open Audit Hub, make sure that you have the following.- Collate in AI mode.
- Permission to view Audit Hub. For more information, see Audit Hub Permissions.
- At least one completed scoring run. Scores appear after the first scheduled Data Insights run completes. An administrator can start a run manually from the Scoring Job tab.
Open Audit Hub
In the left navigation menu, select Governance > Audit Hub.
Page Layout
The page header contains the following controls.- Standard: Selects the standard that every tab reports on. The list contains published standards only. On the Standards & Rules tab the selector is hidden, because that tab lists every standard, including drafts.
- Trend range: Selects the time window of the trend chart: Last 4 weeks, Last 12 weeks, or Last 26 weeks. The default is 12 weeks.
- View Weekly Report: Opens the Weekly Report tab.
The selected standard is stored in the page URL as the
standardId parameter. Switching between tabs keeps the selected standard. Bookmark or share the URL to give someone the same view.
Overview Tab
The Overview tab summarizes the latest scoring run for the selected standard.
Empty and Error States
Until a score is available, or when it fails to load, the tab shows one of these messages.- No scoring runs yet: No run has produced a score for this standard. Scores appear after the first scheduled run completes. An administrator can also start a run from the Scoring Job tab.
- Something went wrong: The score could not be loaded. Try again, and check that the scoring job is running.
Partial Run Banner
When a run measured only part of the standard, a banner appears at the top of the tab. It lists each dimension that wasn’t fully collected and the reason, for example Data Quality: Data Insights did not capture evidence for quality.rowCountProfile. Audit Hub redistributes the weight of an unmeasured dimension across the dimensions that were collected, so the overall score remains comparable.Summary Tiles
Five tiles summarize the run.- Active Standard: The name of the selected standard, its rule version (for example, v2), and the number of enabled checks.
- Overall Completeness: The organization score as a percentage. A change indicator shows the movement in points (pts) since the previous run. A progress bar marks the organization target and shows the points to close, for example 63 pts to close and Target 85%. The target is defined on the Standards & Rules tab.
- Assets Graded: The number of assets graded out of the total number of assets in scope, with a progress bar.
- Open Gaps: The number of failing checks across all assets. The indicator shows the net change since the previous run, where a decrease is an improvement.
- Last Run: The start time of the run, its status (for example Succeeded or Partial), and the date, time, and duration of the run.
Dimension Cards
One card appears for each dimension: Documentation, Ownership, Data Quality, Semantics, and Data Contracts. Each card shows:- The dimension score and its change in points since the previous run.
- The number of checks in the dimension.
- The weight of the dimension, for example 25% weight.
- The number of failing assets.
Completeness Over Time
A line chart shows how the Overall, Documentation, and Data Contracts scores change over the selected trend range. A dashed Target line marks the organization target. Points drawn in a lighter shade are reconstructed from Data Insights history. They were scored on only part of the standard, so they can read higher than live runs.
Domains and Teams Lists
Two lists show how each domain and each team scores. Each row shows the score and the number of open gaps. Click a row to open that domain or team on the Domains & Teams tab.Field Coverage
The Field Coverage table shows, for each check, how many assets pass.
Field Coverage answers which property to fill in. The dimension cards answer which area needs work.
Top Opportunities
Top Opportunities ranks the checks by the points the overall score would gain if every asset passed them. Each entry shows the potential gain (for example, +2.4 pts) and the number of failing assets. Click an entry to open the Gaps tab filtered to that check. When every evaluated check passes, the card shows that no points are left to recover.Next Steps
Find Gaps
Find and export the assets that fail a check.
Manage Standards
Create, edit, publish, and enable standards.
Scoring Job
Review run history and manage the schedule.